Boring Co.’s First Las Vegas Convention Center Tunnel Nears Halfway Point

Las Vegas Review The first of two tunnels being built by the Boring Co. for the Las Vegas Convention Center is nearing the halfway point and is on track to be complete for CES 2021. (Las Vegas Review-Journal) Read More

This post was originally published on this site

Las Vegas Review

The first of two tunnels being built by the Boring Co. for the Las Vegas Convention Center is nearing the halfway point and is on track to be complete for CES 2021. (Las Vegas Review-Journal)

Leave a Reply

Your email address will not be published. Required fields are marked *